Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Abdul-Aziz, A-R and Wong, S S (2010) Exploring the internationalization of Malaysian contractors: the international entrepreneurship dimension. Construction Management and Economics, 28(01), 61.

Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(01), 11.

Davies, M, Jackaway, A, Hardy, R, Dewey, E and Littler, J (2000) A translucent louvre system: design concepts, modelling work and monitored data. Building Research & Information, 28(01), 42–50.

Fay, R, Treloar, G and Iyer-Raniga, U (2000) Life-cycle energy analysis of buildings: a case study. Building Research & Information, 28(01), 31–41.

Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(01), 34.

Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(01), 49.

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors’ frames of reference, and technology on the adoption and use of ICT in construction projects: a Swedish case study. Construction Management and Economics, 28(01), 23.

Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: investigating the contractor’s failure to meet the reasonable prudent standard. Construction Management and Economics, 28(01), 74.

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects. Construction Management and Economics, 28(01), 100.

Luo, J and Gale, A (2000) The evolution of the Chinese construction industry. Building Research & Information, 28(01), 51–8.

Sha, K, Deng, X and Cui, C (2000) Sustainable construction in China: status quo and trends. Building Research & Information, 28(01), 59–66.

Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(01), 2–17.

Vijverberg, G (2000) Basing maintenance needs on accommodation policy. Building Research & Information, 28(01), 18–30.

Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(01), 88.